Laserfiche WebLink
• <br /> Septic Permit 555-21-0071 01-PRMT Page 2 of 2 <br /> Date Certificate`Issued::a7&0/2022 , <br /> Work Description M'AJ REP`for4 BDRM SFD <br /> Conditions of Approvat <br /> •Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> •The system must be installed by the property owner or a licensed sewage disposal business(installer). <br /> •Vehicular traffic and livestock must be restricted from the system area. <br /> •A minimum 18-gauge, green jacketed tracer wire or green color-coded metallic tape must be placed on top of the effluent sewer <br /> or pressure transport pipe from tank to drainfield. <br /> •The hydrosplitter must be located at least 6 inches higher than the piping in the highest disposal trench to ensure that effluent in <br /> the top line does not spill back into the hydrosplitter. <br /> •The system using a hydrosplitter is to be pressurized only to the hydrosplitter,and is to utilize gravity flow from the hydrosplitter <br /> to the disposal trenches. <br /> Installation of this onsite wastewater treatment system has been determined to comply with the applicable requirements in <br /> Oregon Administrative Rules Chapter 340, Divisions 071 and 073 and the Conditions of Approval above. <br /> 1. In accordance with Oregon Revised Statute 454,665,this Certificate of Satisfactory Completion is issued as evidence of <br /> satisfactory completion of an onsite wastewater treatment system at the location identified above. <br /> 2. Issuance of this Certificate does not constitute a warranty or guarantee that this onsite wastewater treatment system will <br /> function indefinitely without failure.Conditions imposed as permit requirements continue for the life of the system. <br /> 3.The area of the initial and the identified replacement area must not be subjected to activity that is likely to adversely affect <br /> the soil or the functioning of the system.Such activities may include, but are not limited to,vehicular traffic, livestock, <br /> covering the area with asphalt or concrete,filling,cutting, or other soil modification activities.. <br /> 4.This onsite wastewater treatment system that be connected to the facility referenced herein within 5 years of the issuance <br /> of this Certificate of Satisfactory Completion (CSC)or rules for authorization notices, alteration permits,or <br /> construction-installation permits as outlined in OAR 340-071-0160, 340-071-0205,or 340-071-0210 apply, including payment <br /> of an additional fee. <br /> 5.This system must operate in compliance with OAR Chapter 340, Division 071 and must not create a public health hazard <br /> or pollute public waters. <br /> 6. Unless otherwise required by the agent,the system installer must backfill this(cover) systemdays after the <br /> within 10 <br /> issuance of this Certificate of Satisfactory Completion. <br /> letion <br /> ° Certificate of Satisfactory Complet►on <br /> System Inspection: Yes • Operation of Law-7 Days Notice: No Pre-Cover Inspection Waived Per 340-071: No <br /> Comments: N/A <br /> • <br /> 1 Completed In pect►ons s <br /> • <br /> Inspector Inspection Inspection Date Inspection Result <br /> Robert Goodwin 7020 Pre-cover 01/27/2022 Approved <br /> Robert Goodwin 7270 Tank Water Tightness 11/19/2021 Approved <br /> Robert Goodwin Onsite Wastewater Specialist 2 <br /> CALL BEFORE YOU DIG...IT'S THE LAW <br /> ATTENTION:Oregon law requires you to follow rules adopted by the Oregon Utility Notification Center. Those rules are set forth by Oregon Administration Rules. You may obtain <br /> copies of the rules by calling the center.(Note:The telephone number for the Oregon Utility Notification Center is 1-800-332-2344.) <br /> 7/20/22:12:13:45PM ONS_OnsiteCSC_pr <br />