My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11190195
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
21-XXXXXX
>
11190195
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2022 1:43:53 PM
Creation date
8/11/2022 4:44:57 PM
Metadata
Fields
Template:
Permits
Permit Address
20627 HIGHWAY 99E NE
Permit City
Aurora
Permit Number
555-21-007101-PRMT
Parcel Number
041W13C 00600
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> Septic Permit 555-21-0071 01-PRMT Page 2 of 2 <br /> Date Certificate`Issued::a7&0/2022 , <br /> Work Description M'AJ REP`for4 BDRM SFD <br /> Conditions of Approvat <br /> •Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> •The system must be installed by the property owner or a licensed sewage disposal business(installer). <br /> •Vehicular traffic and livestock must be restricted from the system area. <br /> •A minimum 18-gauge, green jacketed tracer wire or green color-coded metallic tape must be placed on top of the effluent sewer <br /> or pressure transport pipe from tank to drainfield. <br /> •The hydrosplitter must be located at least 6 inches higher than the piping in the highest disposal trench to ensure that effluent in <br /> the top line does not spill back into the hydrosplitter. <br /> •The system using a hydrosplitter is to be pressurized only to the hydrosplitter,and is to utilize gravity flow from the hydrosplitter <br /> to the disposal trenches. <br /> Installation of this onsite wastewater treatment system has been determined to comply with the applicable requirements in <br /> Oregon Administrative Rules Chapter 340, Divisions 071 and 073 and the Conditions of Approval above. <br /> 1. In accordance with Oregon Revised Statute 454,665,this Certificate of Satisfactory Completion is issued as evidence of <br /> satisfactory completion of an onsite wastewater treatment system at the location identified above. <br /> 2. Issuance of this Certificate does not constitute a warranty or guarantee that this onsite wastewater treatment system will <br /> function indefinitely without failure.Conditions imposed as permit requirements continue for the life of the system. <br /> 3.The area of the initial and the identified replacement area must not be subjected to activity that is likely to adversely affect <br /> the soil or the functioning of the system.Such activities may include, but are not limited to,vehicular traffic, livestock, <br /> covering the area with asphalt or concrete,filling,cutting, or other soil modification activities.. <br /> 4.This onsite wastewater treatment system that be connected to the facility referenced herein within 5 years of the issuance <br /> of this Certificate of Satisfactory Completion (CSC)or rules for authorization notices, alteration permits,or <br /> construction-installation permits as outlined in OAR 340-071-0160, 340-071-0205,or 340-071-0210 apply, including payment <br /> of an additional fee. <br /> 5.This system must operate in compliance with OAR Chapter 340, Division 071 and must not create a public health hazard <br /> or pollute public waters. <br /> 6. Unless otherwise required by the agent,the system installer must backfill this(cover) systemdays after the <br /> within 10 <br /> issuance of this Certificate of Satisfactory Completion. <br /> letion <br /> ° Certificate of Satisfactory Complet►on <br /> System Inspection: Yes • Operation of Law-7 Days Notice: No Pre-Cover Inspection Waived Per 340-071: No <br /> Comments: N/A <br /> • <br /> 1 Completed In pect►ons s <br /> • <br /> Inspector Inspection Inspection Date Inspection Result <br /> Robert Goodwin 7020 Pre-cover 01/27/2022 Approved <br /> Robert Goodwin 7270 Tank Water Tightness 11/19/2021 Approved <br /> Robert Goodwin Onsite Wastewater Specialist 2 <br /> CALL BEFORE YOU DIG...IT'S THE LAW <br /> ATTENTION:Oregon law requires you to follow rules adopted by the Oregon Utility Notification Center. Those rules are set forth by Oregon Administration Rules. You may obtain <br /> copies of the rules by calling the center.(Note:The telephone number for the Oregon Utility Notification Center is 1-800-332-2344.) <br /> 7/20/22:12:13:45PM ONS_OnsiteCSC_pr <br />
The URL can be used to link to this page
Your browser does not support the video tag.