Laserfiche WebLink
Septic Permit 555-21-006262-PRMT Page 2 of 3 <br /> Date cet t#icat Tssued O7I28/2O22 � t <br /> Workflescrrptian FIRE MAJ RFFC73 BDRM,SFQ �f � � � <br /> •This repair permit is for a new seepage trench system, it will consist of a 1000 gallon tank and 80 feet of seepage <br /> trenches. <br /> •This is a reasonable repair, code would require 107.5 linear feet, due to site constraints, 80 feet is acceptable. <br /> •This property was damaged by the Beachie Creek Fire of 2020 <br /> -Properly decommission the old septic tank and submit appropriate documentation. <br /> -Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> •The system must be installed by the property owner or a licensed sewage disposal business(installer). <br /> -Vehicular traffic and livestock must be restricted from the system area. <br /> -All roof drains must be directed away from the system <br /> •All tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty-inch <br /> minimum diameter if less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep. Maintain access • <br /> to septic tank for pumping and service. <br /> -Meet all required setbacks <br /> •A minimum 18-gauge, green-jacketed tracer wire or green color-coded metallic tape must be placed on top of the <br /> effluent sewer or pressure transport pipe from tank to drainfield. <br /> Effluent sewer. The effluent sewer must extend at least 5 feet beyond the septic tank before connecting to the <br /> distribution unit. It must be installed with a minimum fall of 4 inches per 100 feet and at least 2 inches of fall from one <br /> end of the pipe to the other. In addition, there must be a minimum difference of 8 inches between the invert of the <br /> septic tank outlet and either the invert of the header to the distribution pipe of the highest lateral in a serial distribution <br /> field or the invert of the header pipe to the distribution pipes of an equal distribution absorption field. <br /> •Header pipe from Distribution or Drop Box must be minimum 4-ft length, level, and bedded. <br /> •Each drainfield trench must be level within a tolerance of plus or minus 1-inch. <br /> •The system must be installed in the area approved during the site evaluation and in accordance with the <br /> construction plan approved by the agent, including any changes made by the agent. <br /> -All work is to conform to OAR 340, Division 71 and 73. Make no changes in system location or specifications <br /> without approval by the agent. <br /> •For product approval information and manufacturer installation requirements see DEQ website at: <br /> http://www.oregon.gov/deq/Residential/Pages/Onsite.aspx <br /> Installation of this onsite wastewater treatment system has been determined to comply with the applicable requirements in <br /> Oregon Administrative Rules Chapter 340, Divisions 071 and 073 and the Conditions of Approval above. <br /> 1.In accordance with Oregon Revised Statute 454,665,this Certificate of Satisfactory Completion is issued as evidence of <br /> satisfactory completion of an onsite wastewater treatment system at the location identified above. <br /> 2. Issuance of this Certificate does not constitute a warranty or guarantee that this onsite wastewater treatment system will <br /> function indefinitely without failure.Conditions imposed as permit requirements continue for the life of the system. <br /> 3.The area of the initial and the identified replacement area must not be subjected to activity that is likely to adversely affect <br /> the soil or the functioning of the system.Such activities may include, but are not limited to,vehicular traffic, livestock, <br /> covering the area with asphalt or concrete,filling,cutting,or other soil modification activities. <br /> 4.This onsite wastewater treatment system that be connected to the facility referenced herein within 5 years of the issuance <br /> of this Certificate of Satisfactory Completion(CSC)or rules for authorization notices,alteration permits,or <br /> construction-installation permits as outlined in OAR 340-071-0160,340-071-0205,or 340-071-0210 apply,including payment <br /> of an additional fee. <br /> 5.This system must operate in compliance with OAR Chapter 340, Division 071 and must not create a public health hazard <br /> or pollute public waters. <br /> 6.Unless otherwise required by the agent,the system installer must backfill(cover)this system within 10 days after the <br /> issuance of this Certificate of Satisfactory Completion. <br /> 7/28/22:11:58:46AM ONS_OnsiteCSC, pr <br />