Laserfiche WebLink
Onsite Permit 555-22-003955-PRMT Page 2 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule" to 1-888-299-2821 use IVR Number:555050700524 <br /> Schedule using the Oregon ePermitting Inspection App, search "epermitting" in the app store <br /> Date issued: 7/11/22 Expiration date:7/11,23 <br /> Work description: MAJ ALT: 3 BDRM SFD (P21-015, LOT 1 OF 3) <br /> Special Requirements <br /> Stake out required: No <br /> Pump to drainfield reqd: N/A Filter fabric on top of drain media: Yes <br /> Conditions of approval <br /> •Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> •The system must be installed by the property owner or a licensed sewage disposal business(installer). <br /> •Vehicular traffic and livestock must be restricted from the system area. <br /> •All roof drains must be directed away from the system <br /> •The system must be installed in the area approved during the site evaluation and in accordance with the <br /> construction plan approved by the agent, including any changes made by the agent. <br /> •All work is to conform to OAR 340, Division 71 and 73. Make no changes in system location or specifications <br /> without approval by the agent. <br /> •For product approval information and manufacturer installation requirements see DEQ website at: <br /> http://www.oregon.gov/deq/Residential/Pages/Onsite.aspx <br /> •A minimum 18-gauge, green-jacketed tracer wire or green color-coded metallic tape must be placed on top of <br /> the effluent sewer or pressure transport pipe from tank to drainfield. <br /> •Each drainfield trench must be level within a tolerance of plus or minus 1-inch. <br /> •Header pipe from Distribution or Drop Box must be minimum 4-ft length, level, and bedded. <br /> •Serial distribution,each trench bottom to be level and on contour. Use Drop box(es). <br /> 7/11/22:8:38:25AM ONS_OnsitePermit pr <br />