Laserfiche WebLink
ACTION DRAIN PROPOSAL <br /> 503-932-2401 - Jess <br /> 3690 Kashmir Way SE 503-585-8304 - Fax DATE: 6/15/22 <br /> Salem, OR 97317 JOB NUMBER: A38820 <br /> TO: David Isrella- AI\1115 <br /> 6688 Lakota Ln S JOB: 6688 Lakota Ln S <br /> Salem, OR <br /> • Fax Phone: 503-779-9958 <br /> i <br /> We hereby submit specifications and estimates for: <br /> 1 <br /> SEPTIC REPAIRS &JETT DRAINFIELD <br /> *The septic tank inlet baffle will be replaced with 4"PVC Sch.40 Baffle and will be grouted into existing septic tank. <br /> * 5'of sewerline will be replaced beginning at the septic tank inlet. <br /> *The septic tank outlet baffle will be replaced with 4" PVC Sch.40 Baffle and will be grouted into existing septic tank. <br /> *The 4" effluent line will be replaced beginning at septic tank outlet pipe and will extend to distribution box. j <br /> * The Distribution Box will be replaced&with a Serial Drop Box&will be reconnected to existing incoming effluent <br /> line&outgoing header pipes. <br /> * A 2nd Serial Drop Box will be installed&will be connected to existing incoming effluent line &outgoing header <br /> pipes. <br /> *All four Drainfield Legs will be flushed out with a Hydro-Jetter and Video Inspected after cleaning. <br /> * One 24" Orenco Septic Tank Riser will be installed on the existing septic tank <br /> 111111111111.1111111111 <br /> NOTE:Add an additionaito pull a Marion County Septic Permit and have work inspected. (Ask Me About) <br /> NOTE:Any replacement of grass, shrubbery or barkdust will be the responsibility of the property owner. <br /> We Propose hereby to furnish material&labor-complete in accordance with the above specifications for the sum of: <br /> Payment is to be made as follows: In full upon completion of above described work. <br /> Add a 4%fee if Payment is made by Credit Card <br /> All material is guaranteed to be as specified. All work to be completed in a professional manner according to standard practices. Any alteration or <br /> deviation from above specifications involving extra costs will become an extra charge over and above the estimate. All agreements contingen upon <br /> strikes,accidents or delays beyond our control. Unstable Soil,Rocky Soil or CDF removal may be an additional cost. Any unforseen underground <br /> utilities located in repair area may be an additional cost. Note: This proposal may be withdrawn by us if not accepted within 90 days. <br /> Acceptance of Proposal- The above prices,specifications and conditions are satisfactory and are hereby accepted. you are <br /> authorized to do the work as specified. Payment will be made as outlined above. <br /> [Date of Acceptance: 2�ZZ Signature: " (U MC-9— ----, <br /> Page 1 <br />