Laserfiche WebLink
STATE CERTIFIED' 1 �� <br /> Environmental Health Specialist <br /> 9 F:C Ei V 7, ------;\ <br /> 17.1,.....-,..,-------- <br /> f,"'74� '. ' EH-S- 06 40 /F�RION Op''�,o 4+ <br /> ^• General Notes: f t/~t' a E i9 i V VrE GRAYSrONE INC. <br /> �r.,..",.s C Tank Volumes: Total Volume:1200 Ault BUILDING iNSpE''T9ON <br /> ��� Operating Volume:997 salt �-/ <br /> (�s' Average unit volume full depth:21 calf.a P.O.Box 7816 <br /> !I Unit volume attypical operating depth:22ealrnf EUGENE,OR 97401 <br /> Robert Goodwin Loads: Top-400 psf <br /> Lateral load-62.4 psf PHONE:541-726-7666 <br /> 4- 99"Top I Concentrated Wheel Load=2500 lb. <br /> �� �� The septic tank shall be capable of withstanding long-term hydrostatic loading,in addition to the soil loading, <br /> due to a water table maintained at ground surface.Soil Bearing-1500 psf(re-evaluate support bare(((soil <br /> © bearing is Ms or unequal) . <br /> F, <br /> Concrete: The walls and bottom slab shall be ponied monolithically. <br /> r 3"Top of walls typical I Reinforcing steel shall be ASTM A-615 Grade 60,fy1 60,000 psi. <br /> Seep Ring: I The concrete shall achieve a minimum compressive strength of 4,000 psi in 28 <br /> Approved watertight seep Access Port: I days;fe'-4,000 y psi.Concrete shall be reedy mix with cement conforming to <br /> ring or equivalent method 18"Diameter minimum, - I ASTM C-I50,Type II.There shall be a content of not less than six and one half <br /> Position access so that outlet (6 12)soars per cubic yards and maximum aggregate sire of3/4 inch. <br /> Inter fillings are fully exposed:same Water/Cement ratio shall be kept below 0.4,(W:C 0.351).Air-entraining <br /> for Inlet when a riser it wed ' Outlet agents and fibrous reinforcement will enhance workability,curing and <br /> d63"Top watertightaas of the tank;however,their usage is optional. <br /> Access Riser ; Ili 1 I <br /> Arne.Port: Tanks shall not be moved from the manufacturing site to the job site until the <br /> Coupler: 8"Diameter minimum;Position access \ .. took has cured for seven(7)days,or has reached two-thirds of the design <br /> Neoprene and/or no that inlet fittings vieJuNy exposed 1 strength.Propel curing techniques must be used to allure wetertixh(tanks. <br /> approved watertight equivolrnt 1 <br /> 5"t_y Installation: Installation,bedding,compaction,etc.,shall be in strict compliance with the manufacturers standards and <br /> Access Part: 1 state of Oregon's on-site rules 340-71 end 73.All tanks shall be set level on a minimum 3 inch thick <br /> I compacted sand or approved granular bedding overlying a firm uniform base.The base shall be stable and <br /> 8"Diameter minimum; j- -1 uniform in order to ensure equal bearing across the tank bottom.Installations with 30 Mlles or less of ground <br /> Position access so that / • <br /> Mkt JltNngr are fully exposed a 't cover may metre additional buoyancy considerations as described in the manufacturers instructions.A <br /> minimum cover of 12 inches is required over the tank is areas subject to occasional light wheel loads. <br /> Tort: Tanks shall be tested and certified watertight per Oregon On-Site Rules 340-71 and 73. <br /> TopView <br /> Daring:g Dosing volumes not to exceed maximum limits set by Oregon on-sits roles 340.71 and 73.Maximum percent <br /> of projected daily Row:10%to sondfilters or 20%in other applications.Maximum discharge rate from single <br /> compartment dosing septic tank 30 gpm.float and dosing levels may vary within the limits of the matte rules. <br /> Riser and Lid: Tank Markings: Place marking on the upper most surface over the outlet <br /> 24"Dia ribbed PVC riser wilatching lid and Liquid capacity: 1000 gal. I <br /> polyurethane gasket or approved Max burial depth: 4R I <br /> risers shall be attached in a t and Max ba (wheel):2500 lbs._ <br /> permanent Date manufactured: <br /> 1 <br /> A <br /> Slope to drain away from lid / watertight manner <br /> Lids shall bekept sensrelyf renedar all times Permit no.: <br /> with stainless steel bolt <br /> 8"PVC inspection port w/cep <br /> Riser/Tank adapter: <br /> 8"captive PVC laser tank adapter q Cost into concrete top for adapting to riser. <br /> (Band w/PVC cement or 2-panty) \ Bond the riser and adapter together w/PVC i I <br /> cement or 2-part epoxy.Spread around PVC I 3" <br /> or fiberglass riser adapter.If riser cast into t <br /> I� tank embed!-121) 4" _ <br /> Position access port so that sanitary tee <br /> „ <br /> I I Insert Inlet ."I I • Jltrings are fully exposed.Edge of , <br /> /t=' L.L. t— att'rrs S"f m outride edge of wolf <br /> ___ <br /> Sanitary Tee(s): / } -_ _ <br /> 4"min.Dia Sch.40 ' `2"Typ. Install effluent filter snugly <br /> ADS,PVC or approved 18"Typ. (1"Min.) against tank wall Cj <br /> T <br /> fow�L Effluent filter assembly cu E,lA Xk air <br /> 6d-12' HWA optional S7" C bn 4k vcOi <br /> o •,''' a.5 <br /> s4 h p .g. 3_�3.' <br /> b0 <br /> w <br /> • C 0O ., <br /> >' iV <br /> 242"Tapas(typ)--• I 93' -I If 3-12" GO" -I illII <br /> 57" 3 6n <br /> • <br /> e .g .. <br /> Side View End View - Q t 1'0 <br />