Laserfiche WebLink
Onsite Permit 555-21-011479-PRMT Page 2 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule" to 1-888-299-2821 use IVR Number:555O39524617 <br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting"in the app store <br /> ,9 P-i � . $`''� -: N 5 �d'� <br /> "U faro i r. f, p *S K ' B' '+ �'ii <br /> Special Requirements <br /> Stake out required: Yes <br /> Pump to drainfield reqd: Yes Filter fabric on top of drain media: Yes <br /> Conditions of approval <br /> •This permit is for the installation of an Alternative Treatment Technology(ATT)system and is to be installed by <br /> a person certified by the system manufacturer in accordance with OAR 340-071-0600 and 0650.See Alternative <br /> Treatment Technology rules at OAR 340-071-0345. <br /> •In addition to the As-Built and Materials List,a Start-Up checklist from the ATT maintenance provider is <br /> required to Final this permit. <br /> •The owner of an ATT system must maintain a contract with a maintenance provider certified by the <br /> manufacturer to inspect,adjust and maintain the onsite system.The maintenance provider must submit an annual <br /> report and annual evaluation fee. <br /> •Gravelless absorption method rules at OAR 340-071-0290(6).Pressurized distribution required w/distribution <br /> piping perforated with 1/8 inch diameter orifices on maximum 2-foot centers at the 12 o'clock position and at least <br /> a 2-foot residual head at the distal orifice. <br /> •Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> -Vehicular traffic and livestock must be restricted from the system area. <br /> •All roof drains must be directed away from the system <br /> -All tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty-inch <br /> minimum diameter if less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep.Maintain <br /> access to septic tank for pumping and service. <br /> •The system must be installed in the area approved during the site evaluation and in accordance with the <br /> construction plan approved by the agent, including any changes made by the agent. <br /> •AII work is to conform to OAR 340,Division 71 and 73. Make no changes in system location or specifications <br /> without approval by the agent. <br /> •The pump and alarm must be wired on separate circuits in the control panel. Pump wiring must comply with <br /> applicable building,electrical,or other codes.An electrical permit and inspection from the Department of <br /> Consumer and Business Services,Building Codes Division,or the municipality with jurisdiction, is required for <br /> pump wiring installation. <br /> •A minimum 18-gauge,green-jacketed tracer wire or green color-coded metallic tape must be placed on top of <br /> the effluent sewer or pressure transport pipe from tank to drainfield. <br /> 1/10/22:10:38:O8AM ONS_OnsitePermit,pr <br />