Laserfiche WebLink
Onsite Permit 555-20-008243-PRMT Page 2 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule" to 1-888-299-2821 use IVR Number:555079404136 <br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting"in the app store <br /> -xa" "' - •w• a i r• '.d r �f:.. d <br /> Wat•if.d44cnptlon Nam!if$alT fiLL OM Sl"D aV x gy,pp, 5 3 MMM- * <br /> I A b' '�z "-"F -t�a�* a -..� �+ �5"r4,Wtoc <br /> Special Requirements <br /> Groundwater type: Temporary Groundwater depth: 18 in. <br /> Other special rqmt: A barrier to prevent burrowing animals from entering the absorption chambers is required. <br /> Conditions of approval <br /> •This permit is for the installation of an Alternative Treatment Technology(ATT)system and is to be <br /> installed by a person certified by the system manufacturer in accordance with OAR 340-071-0600 <br /> and 0650. See Alternative Treatment Technology rules at OAR 340-071-0345. <br /> •In addition to the As-Built and Materials List, a Start-Up checklist from the ATT maintenance <br /> provider is required to Final this permit. <br /> •The owner of an ATT system must maintain a contract with a maintenance provider certified by the <br /> manufacturer to inspect, adjust and maintain the onsite system.The maintenance provider must <br /> submit an annual report and annual evaluation fee. <br /> •Gravelless absorption method rules at OAR 340-071-0290 (6). Pressurized distribution required w/ <br /> distribution piping perforated with 1/8 inch diameter orifices on maximum 2-foot centers at the 12 <br /> o'clock position and at least a 2-foot residual head at the distal orifice. <br /> •Initial and Replacement Areas—Protection: The installed subsurface absorption field and <br /> designated replacement areas must be protected and kept free of development such as roadways, <br /> covering with asphalt or concrete, filling, cutting, or other soil modifications. <br /> •Dry soil installation only(June 1 —October 1 unless otherwise authorized by the agent). <br /> All tanks must be tested for watertightness and have a water-tight riser to the ground surface. <br /> Twenty- inch minimum diameter if less than 36-in deep.Thirty-inch minimum diameter if greater than <br /> 36-in deep. Maintain access to septic tank for pumping and service. <br /> The system must be installed in the area approved during the site evaluation and in accordance <br /> with the construction plan approved by the agent, including any changes made by the agent. <br /> •The pump and alarm must be wired on separate circuits in the control panel. Pump wiring must <br /> comply with applicable building, electrical, or other codes.An electrical permit and inspection from the <br /> Department of Consumer and Business Services, Building Codes Division, or the municipality with <br /> jurisdiction, is required for pump wiring installation. <br /> •An anti-buoyancy device is required for the septic tank(s)and must be installed as per the <br /> manufacturer installation guidelines. <br /> •A minimum 18-gauge,green-jacketed tracer wire or green color-coded metallic tape must be <br /> placed on top of the effluent sewer or pressure transport pipe from tank to drainfield. <br /> 1/19/22:7:56:41AM ONS_OnsitePermitpr <br />