My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11189690
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
21-XXXXXX
>
11189690
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2022 2:56:14 PM
Creation date
8/11/2022 11:14:11 AM
Metadata
Fields
Template:
Permits
Permit Address
22427 RIVER RD NE
Permit City
St paul
Permit Number
555-21-006090-PRMT
Parcel Number
042W04 01000
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
11 <br /> 4,0AS:4;14441k11401111jchPeRilStIA4V0,406$Y#0m.11jelitif <br /> AX2ON Start-tlp Checklist For Oregon Service Providers <br /> Secondary Treatment System Timer Settings: <br /> ON Tline: 0.15 <br /> Recirculating Splitter Valve Assernhiy..VerifY the,folloWing: <br /> OFF <br /> 0 Verify Preper stinger length,Stinger length: N.)//:\ OVII <br /> AdvanTexSystern(AX2ON):VerifY the folloWIng: OVR OFF Time: <br /> PrAll pods Installed level. ErProper Wire size used based on Information provided by <br /> manufacture <br /> piping properly covered rind Compected. <br /> r sea! <br /> • <br /> Ventilation Systetri,Verify the following: geoncluft Installed. <br /> EKntilaliort Intake(s)properly Iodated and installed. [ 'AI etectrical connections In panel are secure. <br /> AdvanTex niter Operation.Take residual head measurement El/Panel wired per manufacturer's wiring diagram. <br /> palm:SVI V) VNISI2tx4 <br /> Erctinfrel penal start-up procedupti as detailed In the Advenlig <br /> installation Guide,have.been folfewed. <br /> Ped#2: <br /> Secondary Treatment Notes propriate diagrams left in panel for future review. <br /> (Y: AP <br /> Qontrrils Notes: <br /> • <br /> Discharge Pump Basin/Tank Verify the folloviing; <br /> Final/Safety Inspection <br /> Basin Model/lanksize(s): <br /> ErVieually inspect basin/Inks for infiltration: Verify the following: <br /> Eroheek-tbst-ttai-basintlankla-setieve. ecured.04411c4Sixes. <br /> Discharge Basin/Tank Pumping Equipment Verify the:folloWing: All access riser hardware Is In place.Lids are secured. <br /> Pumping equipment Installed properiy. 112 ,orrtrol panel documentation Is left at site;panel Is set <br /> for automatic operation and secured. <br /> gPump and discharge plumbing are compatible <br /> Final Notes:8954e44A 14+. otet -Puy (Alp. <br /> (e:g.pressure milt): <br /> Porrip.model:Installed: <br /> Ggischargepfurribing properly Installed through Watertight <br /> grornmet,and hall valve Is In open position, • <br /> Oteats operate properly, <br /> [ <br /> 'oats set properly. 245 'Lk 1.1 Homeowner's Package <br /> EKplice box mounted in access riser,Watertight connectote „, <br /> used. <br /> Homeowners Package(and manual)has been reviewed <br /> Discharge Basinfiank Pumping System,Verify proper operation of the with homeowner by..,:.(cheok one) <br /> discharge be.S1Ank pumps. <br /> (___J Installer <br /> Pumps,operata in Manual !to <br /> Service Provider <br /> Oumps operate In Automatic VcAks ri Dealer <br /> Controls Other Notes: <br /> NOTiiiiefOr to the control panel instructions for detailed operational <br /> features of the control panel itself. <br /> Fift1 Numben I 4:1S <br /> control 13•4nel rpititalinttalled: :‘1(4405Ax2:0 . <br /> •SCL-ATkOM-0161 <br /> 3110S prenea Systeme ke. <br /> • <br /> hex 34,0/IBS <br /> Page2 RIZ <br />
The URL can be used to link to this page
Your browser does not support the video tag.