My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11189688
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
21-XXXXXX
>
11189688
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2022 1:43:53 PM
Creation date
8/11/2022 11:14:08 AM
Metadata
Fields
Template:
Permits
Permit Address
5584 MARK CT SE
Permit City
Salem
Permit Number
555-21-010305-PRMT
Parcel Number
083W13DA02100
Permit Type
Septic
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Onsite Permit 555-21-010305-PRMT Page 2 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule"to 1-888-299-2821 use IVR Number:555058134510 <br /> Schedule using the Oregon ePermitting Inspection App,search"epermitting"in the app store <br /> slate issued.la/20121 Expiration date tO/20/22 <br /> r,€ 3 <br /> 10 qn MtkREP toREPI ON: :K A n altfl o f € a s e t .1 . <br /> ii <br /> Conditions of approval <br /> •This repair permit is for replacing a tank. <br /> •Properly decommission the old septic tank and submit appropriate documentation. <br /> •The system must be installed by the property owner or a licensed sewage disposal business(installer). <br /> •Vehicular traffic and livestock must be restricted from the system area. <br /> •All tanks must be tested for watertightness and have a water-tight riser to the ground surface.Twenty-inch <br /> minimum diameter if less than 36-in deep.Thirty-inch minimum diameter if greater than 36-in deep. Maintain <br /> access to septic tank for pumping and service. <br /> •Meet all required setbacks <br /> •The system must be installed in the area approved during the site evaluation and in accordance with the <br /> construction plan approved by the agent, including any changes made by the agent. <br /> •A minimum 18-gauge,green jacketed tracer wire or green color-coded metallic tape must be placed on top of <br /> the effluent sewer or pressure transport pipe from tank to drainfield. <br /> •All work is to conform to OAR 340,Division 71 and 73. Make no changes in system location or specifications <br /> without approval by the agent. <br /> •For product approval information and manufacturer installation requirements see DEQ website at: <br /> http://www.oregon.gov/deq/Residential/Pages/Onsite.aspx <br /> 10/20/21:9:08:51AM ONS_OnsitePermitpr <br />
The URL can be used to link to this page
Your browser does not support the video tag.