My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
527290 Misc 05.10.21
Images9
>
Assessors
>
Commercial
>
Commercial File Jackets
>
527290 Misc 05.10.21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2021 4:11:00 PM
Creation date
10/14/2021 9:59:36 AM
Metadata
Fields
Template:
Assessor
Account Number
527290
Assessor Doc Type
Misc
Tax Year
2021-22
Secondary Assessor Doc Type
Jacket
Doc Type Date
5/10/2021
MTL
073W250000700
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Tumalo Station Solar <br />Tumalo, OR <br />7/2/2019 <br />RVC <br />SOLAR ARRAY CONNECTION TO (E) ROOF: <br />Wind Loading: ASCE 7-10 Chapter 30, C&C Simplified Method (Table 30.7-2) <br />3-Sec Gust, V = 120 mph (LRFD) <br />Importance Factor, I = 1.0 (Included in Windspeed) <br />Exposure = B <br />Roof Slope = 5 deg Exposure Adjustment Factor, λ = 0.713 <br />Roof Height = 25 ft Area Adjustment Factor = 1.0 <br />Roof Type = Monoslope Topographic Factor, Kzt = 1.0 <br />Uplift Downforce <br />Table Wind Pressure, Pnet = 40.8 psf 17.2 psf Velocity Pressure, P = 17.1 psf Up <br />ASD Adjusted Pressure, Pnet = 24.5 psf 10.3 psf Velocity Pressure, P = 7.2 psf Down <br />Panel Geometry on Roof:2 Per Panel <br />Tributary Length of Panel = 39 in Max Tributary to Rail (Portrait) <br />Spacing of Standoff Supports = 48 in Match Seam Spacing on Metal Roof <br />Height of Solar Panel = 2 in <br />Height of Array off Roof = 6 in <br />Tributary Area to Support = 13 ft2 <br />Component Loading on Roof: <br />DL Normal Force = 41.9 lbs WL Normal Force, Dn = 93.0 lbs <br />DL Sliding Force = 3.7 lbs WL Normal Force, Up = 221.0 lbs <br />SL Normal Force = 270.6 lbs WL Sliding Force = 0 lbs <br />SL Sliding Force = 23.7 lbs <br />Sliding (Shear) Force on Connection:Uplift (Tension) Force on Connection: <br />LC #1 DL = 3.7 lbs LC #1 DL = 41.9 lbs <br />LC #2 DL+SL = 27.3 lbs LC #3 DL+0.75(SL-WL) = 79.1 lbs <br />LC #3 DL+0.75(SL+WL) = N/A lbs LC #4 0.6DL-WL = -195.8 lbs <br />Uplift (Tension) Due to Height off Roof: <br />Sliding Force on Connection = 27.3 lbs <br />Overturning Force on Rail Pair = 164.0 in-lbs <br />Tension on Connection = 4.2 lbs <br />Check Connection Capacity of S5! Clips:S5!-Z Clips to 22ga ZIP RIB Roofing <br />Max Shear Force = 27 lbs S5! Lateral Capacity = 883 lbs <br />Max Tension Force = 200 lbs S5! Uplift Capacity = 618 lbs <br />Unity Check = 0.35 <br />Wind Zone 1 <br />Number of Rails: <br />S5! Spacing OK <br />USE: S5!-Z Clips to 22ga ZIP RIB Roofing AT 48in ACROSS THE SLOPE, WITH (2) RAILS PER <br />PANEL DOWN THE SLOPE <br />2/12 <br />20 114776 00 BP <br />3225 STATE STREET <br />City of Salem Building & Safety Division 22/35
The URL can be used to link to this page
Your browser does not support the video tag.