My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
585236 Misc 03.02.21
Images9
>
Assessors
>
Commercial
>
Commercial File Jackets
>
585236 Misc 03.02.21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2021 8:00:39 AM
Creation date
10/13/2021 2:46:40 PM
Metadata
Fields
Template:
Assessor
Account Number
585236
Assessor Doc Type
Misc
Tax Year
2021-22
Secondary Assessor Doc Type
Jacket
Doc Type Date
3/2/2021
MTL
073W23CA08500
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Parrish Middle School | Site Plan <br />SALEM-KEIZER PUBLIC SCHOOLS <br />Legend NORTH <br />1 <br />1 <br />2 <br />2 <br />3 <br />3 <br />4 <br />5 <br />4 <br />Science Classrooms <br /> Select classrooms will be renovated into three modern science <br />labs. <br />Secure Front Entrance <br /> The office spaces will be relocated to the north end of the <br />school near D Street. The courtyard entrance near D Street will <br />be repurposed as a new main entry, including a secure vestibule. <br />Hallway <br /> The existing office spaces will be relocated, and a hallway will <br />connect the north and south end of the school. <br />Library improvements <br /> The library will receive new windows and other improvements. <br />Seismic Improvements <br /> Parrish will see seismic improvements to the auditorium, <br />commons, main gym, library and original classroom wing. <br />7.2020 <br />2018 Bond Programsalemkeizer.org/parrish-bond <br />ARCHITECT: <br />CONTRACTOR: <br />TOTAL PROJECT BUDGET*: <br />CONSTRUCTION START: <br />SUBSTANTIAL COMPLETION: <br />BRIC Architecture Inc. <br />TBD <br />$9.8 million <br />June 2021 <br />TBD <br />Improvements <br />Parrish Middle School will see <br />improvements to the HVAC system, as well as improvements to enhance safety and security. <br />• Replacement of single-pane windows <br />• Heating/ventilation system improvements <br />• Exterior seal <br />• Library media center improvements <br />• Security improvements to increase visibility of main entry from office <br />• Intercom system upgrades <br />• Expanded wireless capacity <br />• Electronic badge access system upgrades <br />• Seismic upgrades <br />• Retrofit select existing classrooms to provide three additional science labs <br />July 2020 <br />Parrish Middle School <br />salemkeizer.org/projects-status*Includes bond funds and grants
The URL can be used to link to this page
Your browser does not support the video tag.