Laserfiche WebLink
Onsite Permit 555-21-004271-PRMT Page 3 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule" to 1-888-299-2821 use IVR Number:555048846334 <br /> Schedule using the Oregon ePermitting Inspection App,search"epermitting"in the app store <br /> a '747' dc? d GM."44r d' 3f @n8 4k? .. Fe" _ -- <br /> o � Tssuedrfill$I�'t�� �9W��°" ' ' �a��y�"" ��y�� '� p�` �' �� °' ��6�go � r � ,�� a��`� ratl,`cn date:�6l�t�- <br /> 'A. - , 'i yYA ' 8 4 g, <br /> ark description MA.1.REP:'.3 BQRMSFD. ' 'i :� ° *, a' 4. _Qat p "9 NP moi,,_ 1 .d„ b.,',2, <br /> a <br /> ���p �� �L yd3... °s ti a+�w� <br /> .&,....4.-9.d R"9N 't IP^ w ,.::, 'f':a , <br /> t �'.a�=a.E.,,- � ! z.,,,-..ate ", `''c . .' .-vq 'Ste "v ..." ,. s't t ,.Y... " _ t° d v'.3 `.1 <br /> This Construction-Installation Permit authorizes the property owner to construct an onsite wastewater system <br /> specified above. <br /> Rules,Approved Material Listing;and Database of Licensed Installers can be accessed at: <br /> http://www.deq.state.or.us/wq/onsite/onsite.htm <br /> General Conditions And Requirements For All Permits: <br /> Onsite Construction-Installation Permits are valid for one year from the date of issuance.The expiration date is <br /> noted on this permit.Renewal of a permit may be granted if an application for permit renewal is received before <br /> the permit expiration date. Reinstatement of a permit may be granted if an application for permit reinstatement <br /> Is received within one year after the permit expiration date.Transfer of a permit from the permittee to another <br /> person may be granted if an application for permit transfer is received before the permit expiration date and no <br /> other changes to the permit are necessary. <br /> Installation Requirements:The drainfield must be installed in undisturbed native soil.No alterations of the <br /> natural site conditions such as soil removal or filling,or slope/topography alterations within the approval areas <br /> for both the initial and replacement systems are allowed,unless otherwise authorized by the Agent.Do not <br /> install system when soil moisture,high groundwater,adverse weather,or other conditions that could affect the <br /> quality of installation or reliability of the system are present. If such conditions are present and there is a need <br /> for sewage disposal at the site,the septic tank can be utilized as a temporary holding tank as outlined in <br /> 340-071-0160(9). <br /> Inspection Requirements:The system installer and/or the permit holder must notify the permitting Agent when <br /> the construction,alteration,or repair of a system for which a permit was issued is completed(except for the <br /> backfilling or covering of the installation).The permitting agent has 7 days to perform an inspection of the <br /> completed construction after the official notice date,unless the permitting agent elects to waive the inspection <br /> and authorizes the system to be backfilled earlier. Receipt and acceptance of a completed Final Inspection <br /> Request and Notice form by the permitting agent establishes the official notice date of your request for the final <br /> inspection.Faxed copies are acceptable for inspection request purposes only.Originals must be received <br /> before a Certificate of Satisfactory Completion can be issued. <br /> System Backfill Requirements:The system is to be backfilled or covered as follows:*Only after the permitting <br /> agent has approved the construction installation,*or the inspection has been waived*or the Certificate of <br /> Satisfactory Completion(CSC)has been issued by operation of law(where the inspection has not been <br /> conducted within 7 days of notification of completed installation). <br /> Unless otherwise required,it is the system installer's responsibility to backfill the system within 10 days after <br /> inspection and issuance of the CSC.Backfill must be carefully placed to prevent damage to the system.The <br /> backfill must be free of large stones,frozen clumps of earth,masonry,stumps,waste construction materials,or <br /> other materials that could damage the system.Be sure that the untreated building paper,filter fabric,or other <br /> material approved by the agent is completely covering all drain media where required prior to backfill.The <br /> system can be connected to and placed into service once it has been properly backfilled and the CSC has been <br /> issued. <br /> Initial and Replacement Areas—Protection:The installed subsurface absorption field and designated <br /> replacement areas must be protected and kept free of development such as roadways,covering with asphalt or <br /> concrete,filling,cutting,or other soil modifications. <br /> Rob o./ Onsite Wastewater Specialist 2 6/16/21 <br /> `f ft—SO2—&& 0611( <br /> 6/16/21:3:54:54PM Page 3 of 3 ONS_OnsitePermitpr <br />