Laserfiche WebLink
Onsite Permit 555-20-006784-PRMT Page 3 of 3 <br /> Schedule or track inspections at www.buildingpermits.oregon.gov <br /> Call or text the word "schedule"to 1-888-299-2821 use IVR Number:555084392075 <br /> Schedule using the Oregon ePermitting Inspection App, search"epermitting"in the app store <br /> � �.?;r�.� -n. ,. � >-��„ is 7' �"' �a t`�*3p 5���L "w �+l� '��+ u 1� _: a?�a�- a 3 `3 <br /> Date(s'$A T /20 r- g R I y - � , . xpiratlon datV 1©/1/2�' <br /> r ,,tee t9 �.� s �'�^'+cRy�. ��c�, 5g. .�+"»j ,�- a ?r� '�w,�t i a �' !��?a �t t'�,i � �'�3t <br /> J.YVP�.TM."�,�w. a-e * :>.. .¢, p c ,;t` ^b zt A y, 3 +t t 5 I y s i <br /> �`t( i �t (}� <.!E u '� a� d ��+�'k ad�'�' �3 u�°���t �� � .�q � �ey -4 �� E u�}�+� 1 t� �p�'�, g <br /> OC.A!,, rq i "$ �' � T`T.gO4 IIr�,R 2` mR ,se�go I n ��u.."3 �. . ..``•: ,. 9 ' a a�tizAi 1°i!;a,... spi '� <br /> .._ �'fla .:,.. ". ua�.,� .,. .�i��.+..... ., v.... •ad+� i n_ "^.' u� ..«�..+ ... can ...,.,i..... .._..�' .�....._. »n .... .. ..x.3`�°s` n...,., <br /> This Construction-Installation Permit authorizes the property owner to construct an onsite wastewater system <br /> specified above. <br /> Rules,Approved Material Listing;and Database of Licensed Installers can be accessed at: <br /> http://www.deq.state.or.us/wq/onsite/onsite.htm <br /> General Conditions And Requirements For All Permits: <br /> Onsite Construction-Installation Permits are valid for one year from the date of issuance.The expiration date is <br /> noted on this permit. Renewal of a permit may be granted if an application for permit renewal is received before <br /> the permit expiration date. Reinstatement of a permit may be granted if an application for permit reinstatement <br /> Is received within one year after the permit expiration date.Transfer of a permit from the permittee to another <br /> person may be granted if an application for permit transfer is received before the permit expiration date and no <br /> other changes to the permit are necessary. <br /> Installation Requirements:The drainfield must be installed in undisturbed native soil. No alterations of the <br /> natural site conditions such as soil removal or filling, or slope/topography alterations within the approval areas <br /> for both the initial and replacement systems are allowed, unless otherwise authorized by the Agent. Do not <br /> install system when soil moisture, high groundwater, adverse weather, or other conditions that could affect the <br /> quality of installation or reliability of the system are present. If such conditions are present and there is a need <br /> for sewage disposal at the site,the septic tank can be utilized as a temporary holding tank as outlined in <br /> 340-071-0160(9). <br /> Inspection Requirements:The system installer and/or the permit holder must notify the permitting Agent when <br /> the construction, alteration, or repair of a system for which a permit was issued is completed(except for the <br /> backfilling or covering of the installation).The permitting agent has 7 days to perform an inspection of the <br /> completed construction after the official notice date, unless the permitting agent elects to waive the inspection <br /> and authorizes the system to be backfilled earlier. Receipt and acceptance of a completed Final Inspection <br /> Request and Notice form by the permitting agent establishes the official notice date of your request for the final <br /> inspection. Faxed copies are acceptable for inspection request purposes only. Originals must be received <br /> before a Certificate of Satisfactory Completion can be issued. <br /> System Backfill Requirements:The system is to be backfilled or covered as follows:*Only after the permitting <br /> agent has approved the construction installation,*or the inspection has been waived*or the Certificate of <br /> Satisfactory Completion(CSC)has been issued by operation of law(where the inspection has not been <br /> conducted within 7 days of notification of completed installation). <br /> Unless otherwise required, it is the system installer's responsibility to backfill the system within 10 days after <br /> inspection and issuance of the CSC. Backfill must be carefully placed to prevent damage to the system.The <br /> backfill must be free of large stones,frozen clumps of earth, masonry,stumps,waste construction materials, or <br /> other materials that could damage the system. Be sure that the untreated building paper,filter fabric, or other <br /> material approved by the agent is completely covering all drain media where required prior to backfill.The <br /> system can be connected to and placed into service once it has been properly backfilled and the CSC has been <br /> issued. <br /> Initial and Replacement Areas—Protection:The installed subsurface absorption field and designated <br /> replacement areas must be protected and kept free of development such as roadways, covering with asphalt or <br /> concrete,filling,cutting, or other soil modifications. <br /> 4/1:410/Alt .i , ghf <br /> veNeaf?T /o ff® <br /> 40- <br /> Kimberlee Aldrich Onsi e Wastewater Specialist 2 10/1 20 <br /> 10/1/20:6:51:20AM Page 3 of 3 ONS_OnsitePermit_pr <br />